Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1890.7
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Mar 20, 2023     Avionics and Electrical - (7 hours) Category: Avionics
Prepared questions and panel layout parts for meeting with John H and Luis. Reviewed E-Mag test instructions to decide on E-Mag switch organization.

Met with John and discussed options for simplifying the layout and electrical design and removing components. Discussed wire routing.

Met with Luis and sat in his RV to look at panel visibility under the glare shield, stick and knee clearance under a standard height panel, and locations for headset jacks.

Archived the revision 4 schematic and wire list to capture the current state before I remove parts. Started revision 5 documents to be ready for changes. Reviewed meeting notes and started researching changes.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.